Search Results for keywords:"railroad signal system"

Found 5 results
Skip to main content

Search Results: keywords:"railroad signal system"

  • Type:Notice
    Citation:86 FR 6949
    Reading Time:about 2 minutes

    Norfolk Southern Corporation has requested approval from the Federal Railroad Administration (FRA) to discontinue a traffic control system on certain rail lines between Andover and Bulls Gap in the Blue Ridge Division. The request includes a change to a different operating rule and installation of new signals at specified locations. The FRA has opened the proposal for public comment and has provided instructions on how to submit comments by March 11, 2021. The FRA does not plan to hold a public hearing unless there is a specific request for one.

    Simple Explanation

    Norfolk Southern wants to stop using some train control signals on a rail line and put in new signals instead, and they have asked the government for permission, inviting people to share their thoughts by March 11, 2021.

  • Type:Notice
    Citation:86 FR 7613
    Reading Time:about 2 minutes

    The Federal Railroad Administration (FRA) received a petition from Norfolk Southern Corporation to discontinue a traffic control system on part of the D&H line. Norfolk Southern plans to modify the signal systems and change the operation to NS Rule 171 between certain mileposts. This change is requested because the existing traffic control system is no longer needed for operations. The FRA is inviting public comments on this petition, which can be submitted through various means until March 15, 2021.

    Simple Explanation

    The Federal Railroad Administration is looking at a request from the Norfolk Southern train company to stop using a special system that helps guide trains on part of their track, because they say it isn’t needed anymore. They want to know what people think about this idea and are asking for comments until March 15, 2021.

  • Type:Notice
    Citation:86 FR 9992
    Reading Time:about 2 minutes

    Norfolk Southern Corporation has asked the Federal Railroad Administration (FRA) for permission to discontinue or modify a signal system on the Bloomington District of the Midwest Division, between certain mileposts, which include several control points and automatic signals. They plan to switch this segment to a different type of operation because the current system is no longer needed for their operations. The FRA has given the public until April 5, 2021, to share their comments on this proposal through various methods such as online comments, fax, mail, or hand delivery. Comments will help the FRA decide on the petition, although it doesn't expect a public hearing unless requested.

    Simple Explanation

    A train company wants to stop using some signal lights on their tracks because they think they don't need them anymore. People have until April 5, 2021, to tell the train bosses if they think it's a good or bad idea.

  • Type:Notice
    Citation:86 FR 7613
    Reading Time:about 2 minutes

    Union Pacific Railroad Company (UP) has petitioned the Federal Railroad Administration (FRA) to discontinue or modify its signal systems, specifically the automatic train control (ATC) and automatic cab signal (ACS) systems. The petition, submitted on January 14, 2021, argues that the positive train control (PTC) system, along with new operating rules and equipped switches, provides a higher safety level than ATC/ACS alone. The FRA has made the petition available at www.regulations.gov for public participation and invites written comments by March 15, 2021. If stakeholders believe a public hearing is necessary, they must notify the FRA in writing before the comment period ends.

    Simple Explanation

    Union Pacific Railroad wants to stop using old train safety systems because they have a new, better one. They’ve asked for permission, and people can tell the train bosses what they think before March 15, 2021, by writing comments online.

  • Type:Notice
    Citation:86 FR 6950
    Reading Time:about 2 minutes

    Norfolk Southern Corporation has petitioned the Federal Railroad Administration (FRA) to either discontinue or modify a signal system on certain sections of its rail line in Alabama. The company claims that the current traffic control system is no longer needed for its operations. Public comments on this request are invited by March 11, 2021, through various submission methods detailed in the notice. The FRA has not scheduled a public hearing but may consider it if requested appropriately.

    Simple Explanation

    Norfolk Southern wants to change or stop using special lights and signals on their train tracks in Alabama because they think they don't need them anymore, and they are asking if anyone disagrees. People can tell them what they think until March 11, 2021.