Search Results for citation:"90 FR 8017"

Found 2 results
Skip to main content

Search Results: citation:"90 FR 8017"

  • Type:Notice
    Citation:90 FR 8017
    Reading Time:about 5 minutes

    The Federal Energy Regulatory Commission (FERC) has accepted an application from Current Hydro Project 19, LLC for a major license to develop the New Cumberland Hydroelectric Project in West Virginia. The project will be located at the New Cumberland Locks and Dam on the Ohio River and will include new facilities such as a powerhouse and a substation with a capacity of 19.99 megawatts. Interested parties have 60 days from the notice date to file motions to intervene or protests. The application will follow a procedural schedule, with the first scoping document being issued in April 2025.

    Simple Explanation

    FERC is thinking about letting a company build a big new power station on a river in West Virginia, and people have 60 days to say if they think it's a good idea or not.

  • Type:Notice
    Citation:90 FR 8017
    Reading Time:less than a minute

    In the notice document titled "Interregional Transfer Capability Study: Strengthening Reliability Through the Energy Transformation," the Federal Energy Regulatory Commission issued a correction. The correction was made regarding the document's Docket Number, which should be presented as it is stated in the Federal Register notice from December 27, 2024. This change was filed on January 22, 2025.

    Simple Explanation

    The Federal Energy Regulatory Commission made a small fix to a document about how we share energy between big regions to make sure we always have enough electricity. They wanted to make sure the number on the document matched the one they used in an important list from before.