Search Results for keywords:"Algonquin Power

Found 2215 results
Skip to main content

Search Results: keywords:"Algonquin Power

  • Type:Notice
    Citation:90 FR 10717
    Reading Time:about 19 minutes

    In a recent notice, the Federal Energy Regulatory Commission (FERC) approved new standards and a definition related to inverter-based resources (IBRs), following petitions from the North American Electric Reliability Corporation (NERC). These new standards, named PRC-028-1, PRC-002-5, and PRC-030-1, aim to enhance the monitoring and analysis of disturbances in the Bulk-Power System, especially those involving solar and wind resources connected through inverters. These rules require generator owners to install equipment to track disturbances and ensure data is shared correctly to maintain system reliability. The document also details the expected reporting burdens for compliance with these new standards.

    Simple Explanation

    The government has made new rules for how big electricity machines, like those helping solar and wind power, should watch for and share important information to make sure the electricity stays on. They want to make sure everyone follows these rules properly, but not everyone knows how it will affect smaller businesses or how they'll check if everyone is doing what they're supposed to.

  • Type:Notice
    Citation:90 FR 7238
    Reading Time:about 7 minutes

    The National Highway Traffic Safety Administration (NHTSA) has denied a petition from Mr. Sergio Betancourt to investigate claims of "wrong-sized wrist pins" in certain Mercedes-Benz vehicles. After reviewing technical data and complaints, the NHTSA concluded there was not enough evidence linking wrist pin issues to significant engine failures or threats to vehicle safety. As a result, they have decided that no further investigation is warranted at this time, but the agency will continue to monitor any new developments.

    Simple Explanation

    The government checked to see if there was a problem with certain parts in some cars and decided there's no need to look into it more because there wasn't enough proof of danger.

  • Type:Notice
    Citation:90 FR 13157
    Reading Time:about 5 minutes

    The Federal Energy Regulatory Commission (FERC) announced it has received numerous filings related to energy rates and market activities. One filing is from Wakefield BESS 1 LLC, which seeks to self-certify as an exempt wholesale generator. Other filings involve requests for rate changes, compliance filings, and tariff amendments from various energy companies including NRG Power Marketing LLC, MidAmerican Energy Company, and PJM Interconnection, L.L.C. Public comments on these filings are due by April 4, 2025, except for a filing by Hickory Wind LLC, which has a comment deadline of April 3, 2025. The public is encouraged to participate by using FERC's eLibrary system for access to the documents and filing procedures.

    Simple Explanation

    The government has received lots of letters from energy companies asking for permission to change prices or rules. People can tell the government what they think about these requests until April 4, 2025.

  • Type:Notice
    Citation:90 FR 11164
    Reading Time:about 5 minutes

    The Federal Energy Regulatory Commission (FERC) announced a series of filings related to electric corporate and rate proceedings. Companies like Longview Power, LLC and Duke Energy Carolinas, LLC, among others, have submitted applications and rate filings with varying effective dates and comment submission deadlines. Members of the public who wish to comment or participate in these proceedings can do so by following the guidelines set by FERC. The Office of Public Participation is available to assist anyone needing help navigating the filing and commenting process.

    Simple Explanation

    The people who make rules about energy got some letters from different companies who want to change things about how they do business. They're asking others if they want to share their thoughts about these changes, but the way they ask is pretty tricky to understand.

  • Type:Rule
    Citation:90 FR 4589
    Reading Time:about 78 minutes

    The U.S. Department of Energy (DOE) has issued a final rule clarifying the test procedures for general service lamps (GSLs). These clarifications emphasize that GSLs shouldn't be tested as colored lamps, and if a lamp includes extra components not affecting light output, those components should be turned off during tests. For non-integrated lamps, the rule specifies testing with a ballast or driver that's compatible and commercially available, where possible. The final rule is designed to ensure consistent testing without imposing additional costs or burdens on manufacturers.

    Simple Explanation

    The U.S. Department of Energy has made a new rule about testing light bulbs to make sure they shine the right way, telling people how to test them without any extra parts turned on that don’t make them brighter. They also say which parts you should use when testing bulbs that need special devices to light up, using only ones you can easily get.

  • Type:Notice
    Citation:90 FR 8007
    Reading Time:about 4 minutes

    Zebra Technologies Corporation has submitted a notification to the Foreign-Trade Zones (FTZ) Board seeking approval to conduct certain production activities at its Kenosha, Wisconsin facility, located within FTZ 41. This involves using foreign and domestic materials to produce various computer printing products, such as thermal printers and mobile computing devices, with any production limited to specified materials and finished products. The public is invited to comment on the proposal by March 4, 2025, and further details can be accessed on the FTZ Board's website.

    Simple Explanation

    Zebra Technologies wants to make special printers in a specific area in Wisconsin that helps them save on taxes, and they're asking for permission to do this. People can say what they think about this plan until March 4, 2025.

  • Type:Notice
    Citation:90 FR 13208
    Reading Time:about 11 minutes

    ICG Beckley, LLC has asked the Mine Safety and Health Administration (MSHA) to allow the use of certain air purifying respirators to protect miners at its Beckley Pocahontas Mine in West Virginia. These respirators, specifically the CleanSpace EX and 3M Versaflo TR-800, are not currently approved under MSHA standards, but the company argues they offer comparable protection and comfort, especially in hot working conditions. The petition highlights issues with the supply and discontinuation of previously used equipment and outlines rigorous inspection and training procedures to ensure safety. MSHA is accepting public comments on the petition until April 21, 2025.

    Simple Explanation

    ICG Beckley, which runs a mine, is asking for permission to use special masks to keep workers safe, even though these masks aren't officially approved yet. They believe the new masks work well and are asking people to share their thoughts about this idea by April 21, 2025.

  • Type:Rule
    Citation:89 FR 100730
    Reading Time:about 13 minutes

    The Federal Aviation Administration (FAA) has issued special conditions for the Robinson Helicopter Company Model R66 helicopter, modified by Skyryse, due to a new control input and fly-by-wire system. These conditions add safety standards not covered by existing rules, ensuring the helicopter's safety is in line with current airworthiness standards. The special conditions address the interaction of systems and structures, outlining requirements for both normal operation and system failure scenarios to maintain safety. These conditions apply not just to the R66 model but could also extend to other models if they incorporate similar designs.

    Simple Explanation

    The FAA made new safety rules for a helicopter that has a fancy computer control system, like a video game controller, to make sure it flies safely. These rules are important because the old ones didn't cover this new technology.

  • Type:Notice
    Citation:90 FR 16871
    Reading Time:about 5 minutes

    The document is a notice from the Federal Energy Regulatory Commission about several filings related to wholesale energy generation and electric rate changes. Various companies, such as Clinton Solar LLC and PacifiCorp, have submitted notices and amendments concerning their status and tariffs. Interested parties have a deadline by which they can comment or intervene in these proceedings. The Commission also provides information on how to access and respond to these filings using its online system.

    Simple Explanation

    The notice is about some companies wanting to change how they sell energy and the costs of electricity, and people can say if they agree or not, but some parts are confusing because they use big words and unclear dates.

  • Type:Notice
    Citation:86 FR 2668
    Reading Time:about 6 minutes

    The Federal Energy Regulatory Commission (FERC) announced various filings related to electric companies and utilities. These filings include applications for changes in corporate status, self-certification notices for exempt wholesale generators, rate filings, and compliance documents. The filings come from several applicants, including Brookfield Asset Management Inc., Midcontinent Independent System Operator, Inc., Southern California Edison Company, and others, with various deadlines for comments. Additionally, the North American Electric Reliability Corporation has filed a petition for the approval of proposed reliability standards related to cybersecurity. Interested parties can view these filings in FERC's eLibrary system and may intervene or protest according to FERC's Regulations.

    Simple Explanation

    The Federal Energy Regulatory Commission (FERC) is like a referee making sure everyone plays fair in energy land. They've got some new rules and changes happening with electric companies, and they want people to know about them and give their thoughts.