Search Results for citation:"90 FR 11160"

Found 2 results
Skip to main content

Search Results: citation:"90 FR 11160"

  • Type:Notice
    Citation:90 FR 11160
    Reading Time:about 3 minutes

    Low Head Hydro M 13, LLC., has filed an application for a preliminary permit to study the feasibility of constructing a hydropower project at the U.S. Army Corps of Engineers' Mississippi River Lock and Dam 13 in Iowa and Illinois. The proposed project would include a powerhouse with three turbines, a substation, access roads, and transmission lines, aiming to generate approximately 94,500 megawatt-hours annually. This permit would not allow any construction or land use without permission; it simply grants priority for filing a license application later. Comments or competing applications can be submitted within 60 days of this notice's issuance.

    Simple Explanation

    Low Head Hydro M 13, LLC wants to explore if they can build a power project on the Mississippi River that would use flowing water to make electricity. Right now, they just want permission to study the idea, and people have 60 days to say what they think or if they want to suggest a different plan.

  • Type:Notice
    Citation:90 FR 11160
    Reading Time:about 2 minutes

    The City of Pasadena, California, filed a tariff update with the Federal Energy Regulatory Commission, effective January 1, 2025. People interested in this matter can submit comments, protests, or requests to intervene by following specific guidelines, as mentioned in the Commission's rules. The Commission emphasizes electronic submissions through its website, and assistance is available for public engagement and navigating the submission process. Submissions must be completed by March 5, 2025, at 5:00 p.m. Eastern Time.

    Simple Explanation

    The City of Pasadena wants to change some rules about how they use and charge for energy, and they told a big energy group about it. People can say what they think about these changes, but they have to do it by March 5, 2025.