FR 2024-29285

Overview

Title

KEI (Maine) Power Management (I), LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments

Agencies

ELI5 AI

The government is checking a plan from a company in Maine to keep running a small power plant by a river. People can tell the government if they think more studies are needed or join the project's planning team until January 26, 2025, so they can help protect fish and clean water in that area.

Summary AI

The Federal Energy Regulatory Commission (FERC) has received a hydroelectric application from KEI (Maine) Power Management (I), LLC for the Eustis Hydroelectric Project in Maine. The application, which seeks a subsequent minor license, is available for public viewing and involves maintaining current project facilities and operations. Interested parties can submit additional study requests or apply for cooperating agency status until January 26, 2025. The project consists of a dam, powerhouse, and associated facilities, and operates to protect local water quality and aquatic resources. The FERC encourages electronic filings and provides various resources for public engagement and participation in the application process.

Type: Notice
Citation: 89 FR 100475
Document #: 2024-29285
Date:
Volume: 89
Pages: 100475-100476

AnalysisAI

The Federal Energy Regulatory Commission (FERC) has put forth a notice regarding a hydroelectric application by KEI (Maine) Power Management (I), LLC for their Eustis Hydroelectric Project located in Maine. This application is for a subsequent minor license to continue existing operations without any proposed changes to the facilities or how they are run.

General Summary

The Eustis Hydroelectric Project is situated on the North Branch of the Dead River in Eustis, Maine, and seeks to maintain its current operational structure under a new license. The application proposes to retain the present method of water management that supports both aquatic resources and water quality. The FERC notice outlines the process by which additional scientific studies can be requested to assess the environmental impact of the project more comprehensively.

Significant Issues and Concerns

One of the main challenges with this document is its technical and regulatory language, which might be difficult for the general public to fully understand. The text references numerous legal and procedural regulations, such as specific sections of the Federal Power Act and the Code of Federal Regulations, which may not be accessible to those without specialized knowledge.

The document specifies a deadline of January 26, 2025, for submitting requests for additional studies or cooperating agency status but does not provide information on the implications of missing this deadline or processes for obtaining extensions. This lack of detail can be problematic for stakeholders who may need more time to understand the application and its impacts.

Moreover, the document delves into a dense description of the project components, listing technical specifications and operational aspects without simplifying them for general readership. This can make it challenging for the public and interested parties to discern important details and implications.

Public Impact

For the general public, this document signifies an opportunity to engage with the licensing process of a hydroelectric project that impacts local water resources. Given its complexity, accessing this information and understanding the potential benefits or disadvantages might be an uphill task without additional support or simplification.

From an environmental perspective, the notice's potential failure to prompt adequate additional studies could mean that any unexamined environmental impacts might not be addressed. This could have lasting effects on local ecosystems and resource management.

Stakeholder Impact

For local residents and environmental groups, the opportunity to request additional studies is crucial. Not conducting further environmental assessments raises concerns about possible overlooked environmental impacts that might affect local land and water resources.

Cooperating agencies, which include federal, state, local, and tribal entities, face ambiguity regarding their roles since the document does not clearly outline what is expected of them once they decide to partake in the process. Their potential involvement is crucial for a holistic environmental analysis but may be limited by the lack of detailed guidance.

Businesses and project proponents, like KEI Power, will benefit from a smooth relicensing process should there be no additional studies or operational changes required, offering stability in their operations. This document provides them a clear timeline and process to ensure compliance with regulations, albeit within a complex framework of procedural requirements.

In conclusion, while the FERC notice allows for public scrutiny and engagement in the hydroelectric project’s license renewal process, its technical depth and regulatory emphasis may limit meaningful participation unless simplified or supplemented with clear guidance. The implications for both local environments and broader community interests highlight the importance of transparent and accessible regulatory processes.

Issues

  • • The document might be difficult for the general public to fully understand due to its technical nature and numerous regulatory references, such as specific sections of the Federal Power Act and CFR.

  • • The document uses complex legal and technical language that could be simplified to enhance readability.

  • • The deadline for submissions is given as a specific date (January 26, 2025) without a detailed explanation on what happens if the deadline is missed or processes for extensions.

  • • The section detailing the project components (m) is dense, with many sub-points, making it hard to follow and potentially overwhelming for those not familiar with such infrastructure.

  • • There is no clear explanation of the potential environmental or community impact of not conducting additional studies, leaving stakeholders to question the need for participation.

  • • The roles and expectations for cooperating agencies are not detailed, possibly leading to confusion about their responsibilities in the study process.

  • • The option for paper submissions includes two different addresses for submissions via U.S. Postal Service and other carriers, which could lead to confusion and misdirection of physical mail.

Statistics

Size

Pages: 2
Words: 1,362
Sentences: 44
Entities: 135

Language

Nouns: 451
Verbs: 76
Adjectives: 80
Adverbs: 12
Numbers: 99

Complexity

Average Token Length:
5.13
Average Sentence Length:
30.95
Token Entropy:
5.42
Readability (ARI):
21.48

Reading Time

about 5 minutes