FR 2024-28838

Overview

Title

Basin Electric Power Cooperative; Notice of Institution of Section 206 Proceeding and Refund Effective Date

Agencies

ELI5 AI

The government is checking if the prices and deals for electricity from a company called Basin Electric Power are fair for everyone. They want people to let them know if they want to join the discussion and to do this, it’s best to use a computer to send in their thoughts.

Summary AI

The Federal Energy Regulatory Commission (FERC) has launched an investigation into whether the Basin Electric Power Cooperative's 2020 Rate Schedule A and Wholesale Power Contracts are unfair or discriminatory. The investigation is under section 206 of the Federal Power Act. Anyone interested in participating must file a request with FERC through either electronic means or mail within 21 days. FERC encourages electronic filings and provides resources for public participation and assistance through their Office of Public Participation.

Type: Notice
Citation: 89 FR 97606
Document #: 2024-28838
Date:
Volume: 89
Pages: 97606-97606

AnalysisAI

The Federal Energy Regulatory Commission (FERC) has initiated an investigation into the 2020 Rate Schedule A and Wholesale Power Contracts of the Basin Electric Power Cooperative. This step, taken under section 206 of the Federal Power Act, aims to determine whether these contracts are unjust, unreasonable, or discriminatory. The proceedings were noted in the Federal Register, which serves to inform the public about the ongoing investigation and to solicit involvement from interested parties.

General Summary

The document announces the start of this investigation and sets a refund effective date, which coincides with the publication in the Federal Register. Additionally, it provides detailed instructions for those who wish to participate in the investigation process, offering avenues for electronic and mail submissions. In efforts to facilitate public participation, FERC encourages electronic filings and provides information regarding assistance available through its Office of Public Participation.

Significant Issues and Concerns

Despite the document's thoroughness, there are areas of concern. First and foremost, the document does not explain why the investigation is necessary, potentially causing confusion about the reasons behind this regulatory scrutiny. For the layperson, understanding the investigation's purpose is crucial to foster transparency and trust in regulatory processes.

Furthermore, the document is replete with technical legal references which might not be accessible to those without specialized knowledge in legal or regulatory affairs. This complexity can be intimidating and discouraging to individuals and small organizations interested in engaging with the process but lacking expert understanding.

The instructions provided, though precise, could be overwhelming due to their complexity and the multitude of contact options offered. This might dissuade potential participants from getting involved, thus limiting broader public engagement which FERC aims to promote.

Impact on the Public

Broadly, this document signifies governmental oversight in ensuring power contracts are fair and equitable. This oversight potentially impacts ratepayers by possibly leading to adjustments in rates or contract terms. However, the impact on the general public could be limited if the complexity of language and procedures deters participation.

Impact on Specific Stakeholders

For Basin Electric Power Cooperative and its members, this investigation could mean changes to their current contracts, possibly prompting a reevaluation of pricing, practices, or both. For stakeholders such as consumers dependent on Basin's services, this investigation could result in more equitable rates, enhancing consumer trust and satisfaction.

Other stakeholders, including environmental justice communities, landowners, and tribal members, might find advocacy opportunities within this investigative process. The presence of the Office of Public Participation offers a dedicated resource for helping these groups engage meaningfully.

In conclusion, while FERC’s initiative highlights regulatory vigilance, the document’s complexity and lack of a clear rationale might hinder public understanding and involvement. To maximize beneficial outcomes, simplifying the language and clarifying the necessity for the investigation could enhance transparency and stakeholder engagement.

Issues

  • • The document does not provide clear justification for why the investigation into Basin Electric Power Cooperative's Rate Schedule A and Wholesale Power Contracts was initiated, which could lead to misunderstandings about the necessity and scope of the inquiry.

  • • The document uses technical legal references (e.g., 'Docket No. EL25-16-000', 'Rule 214 of the Commission's Rules of Practice and Procedure, 18 CFR 385.214') that might not be easily understood by individuals without legal or regulatory background, making the document difficult to interpret for the general public.

  • • The instructions for intervention and submission of comments are detailed and complex, which may discourage or confuse individuals or organizations that wish to participate in the proceeding.

  • • The document contains multiple sections of instructions and contact details which, while thorough, may overwhelm the readers with excessive information and multiple points of contact, making it difficult to decide whom to contact for specific issues.

Statistics

Size

Pages: 1
Words: 659
Sentences: 21
Entities: 78

Language

Nouns: 229
Verbs: 39
Adjectives: 30
Adverbs: 4
Numbers: 53

Complexity

Average Token Length:
4.91
Average Sentence Length:
31.38
Token Entropy:
5.06
Readability (ARI):
20.83

Reading Time

about 2 minutes