FR 2021-03930

Overview

Title

Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida

Agencies

ELI5 AI

The government has decided to build a new place where cars can get on and off a big road called Interstate 95 in Florida. They have all the permits to start the project, but anyone who thinks there's a problem has to speak up before July 26, 2021.

Summary AI

The Federal Highway Administration (FHWA) has announced final actions regarding a new interchange project on Interstate 95 at Pioneer Trail in Volusia County, Florida. These actions, made in collaboration with the Florida Department of Transportation (FDOT) and other federal agencies, involve granting necessary licenses, permits, and approvals for the project. The public is advised that any judicial review of these actions must be filed by July 26, 2021, or within a timeframe specified by federal law if shorter. This project includes constructing a new interchange and addressing environmental impacts through measures such as stormwater management and floodplain compensation ponds.

Abstract

The FHWA, on behalf of the FDOT, is issuing this notice to announce actions taken by FDOT and other Federal Agencies that are final agency actions. These actions relate to the proposed interchange on Interstate 95 at Pioneer Trail (County Road 4118) in Volusia County, State of Florida. These actions grant licenses, permits, or approvals for the project.

Type: Notice
Citation: 86 FR 11822
Document #: 2021-03930
Date:
Volume: 86
Pages: 11822-11823

AnalysisAI

The Federal Highway Administration (FHWA), working with the Florida Department of Transportation (FDOT) and other federal agencies, has made final decisions regarding a new interchange project on Interstate 95 at Pioneer Trail in Volusia County, Florida. This notice, issued by the FHWA on behalf of the FDOT, signifies that the necessary approvals, licenses, and permits have been granted for this project. The document's implications are critical for both the general public and specific stakeholders involved in or affected by the project.


Summary of the Document

The document informs the public about the final steps taken by FDOT and federal agencies for a new interchange project on I-95 in Volusia County. This project involves constructing a new interchange, which includes environmental measures like stormwater management and floodplain compensation ponds. The public is advised that any legal challenges to these actions must be initiated by July 26, 2021.

Significant Issues

The document raises several concerns. Firstly, it lacks detailed information regarding the project's budget or estimated costs, making it challenging to assess potential financial waste. Secondly, there is no mention of an independent oversight body to ensure the project's funds are utilized properly. Moreover, although the document references a wide array of laws and executive orders, it does not clarify their specific impacts on the project, which may hinder public understanding. The use of technical terminology and statutory codes might also be difficult for individuals without legal expertise to comprehend. Finally, while it mentions the involvement of various federal agencies, the document does not specify their respective roles in the project.

Impact on the Public

The document could have various repercussions on the public. The development of the new interchange is likely to improve traffic flow and possibly boost local economic activity by enhancing accessibility in Volusia County. However, the lack of transparency regarding project costs and oversight may lead to public skepticism about its financial efficiency. The timeframe for seeking judicial review may also impact individuals or groups who wish to contest the project's decisions, necessitating timely action.

Impact on Specific Stakeholders

Specific stakeholders, such as local residents, business owners, and environmental groups, may experience different effects due to this project. Local residents may benefit from reduced traffic congestion and improved road safety. Business owners might see increased patronage due to better accessibility. Conversely, environmental groups may have concerns about the project's ecological impact, despite planned mitigation efforts. The absence of detailed information on budget and oversight might worry stakeholders concerned about project accountability and fiscal management.

In conclusion, while the document provides essential information about the approvals for the I-95 interchange project, stakeholders and the general public would benefit from greater transparency and detail regarding the project's execution and oversight.

Issues

  • • The document does not provide specific details on the budget or costs associated with the I-95 interchange project, which makes it difficult to evaluate potential wasteful spending.

  • • There is no mention of independent oversight or auditing of the project to ensure funds are used properly and fairly.

  • • The document makes references to a variety of laws and executive orders but does not succinctly explain their specific impact on the project, which could be complex for general understanding.

  • • The document uses technical terminology and references to specific statutes and codes (e.g., U.S.C. numbers) that may be difficult for a layperson to understand without additional context or explanation.

  • • The notice does not specify which federal agencies, other than FDOT, are involved or what their specific roles are in this project.

Statistics

Size

Pages: 2
Words: 1,315
Sentences: 68
Entities: 214

Language

Nouns: 495
Verbs: 44
Adjectives: 32
Adverbs: 4
Numbers: 161

Complexity

Average Token Length:
4.84
Average Sentence Length:
19.34
Token Entropy:
5.29
Readability (ARI):
14.23

Reading Time

about 4 minutes